Skip to main content
  • News
  • Call for tenders
  • Gallery
  • Careers
  • Useful Links
  • Contact
Home
  • WAPP
    • Creation of the WAPP
    • Governing Structures
  • Members Utilities
  • Partners
  • Documentation
  • Calendar
  • Power grid
  • WAPP DEPTS
    • Admin & Finance
    • PIPES
    • ICC
Member space

Member Login

Image CAPTCHA
Lost password
  • English
  • Français

Banner news & pages internes

  1. Home
  2. Technical Assistance for development of St Paul River & WAPP Integration
Ref.45A00

Technical Assistance for development of St Paul River & WAPP Integration

Tuesday, January 3, 2017 to Saturday, January 28, 2017
Download

The aim of this consultancy is to assist the WAPP and Liberian Authorities in environmental and social activities that may arise linked to Component Practical activities identified so far include in close collaboration with the engineering consultancy in charge of technical studies, review of the environmental and social scoping of different alternatives that will be considered under the initial River Basin Optimization Study and preparation of the ESIA and associated Environmental and Social Management Plans (ESMP) and Resettlement Action Plan (RAP) for the two priori schemes selected in first phase. At this stage it is anticipated that the priority schemes will include via Reservoir at the head of the River basin for regulating flows and one hydropower scheme downstream including the transmission line to evacuate energy to the CLSG and the national system.

Download
40th Coordination Meeting of WAPP Technical and Financial Partners
Thursday, July 20, 2023
communiqué:Successful synchronization of the WAPP power grid – A decisive step towards regional electricity integration
Tuesday, July 18, 2023
WAPP working visit with AFDB to discuss project implementation delays
Wednesday, June 14, 2023
Consult all news

Upcoming events

Constitutive General Assembly of the network of Regional Center of Excellence of WAPP
Saturday, June 24, 2023

Center of Documentation

Updating of the Detailed Inventory of Affected Properties and the Census of Persons affected by the NorthCore Project in Benin
Environmental and Social Impact Study of the 225 kV electrical connection project at the Kaya 75 MWp regional solar power plant First part: ESIA (ESMP in a separate volume)
Environmental and Social Impact Study of the Kaya 75 MWp Regional Solar Power Plant Project First part: ESIA (ESMP in a separate volume)
View all documents


Members
Utilities

Supporting West Africa in the realization of the regional electricity market

Do you need more information ?

Address

West African Power Pool

Zone des Ambassades – PK 6

06 BP 2907 Cotonou

Republic of Benin

Phone / Email

+229 91 21 52 52

+229 91 21 53 53

info@ecowapp.org

Social media

Newsletter

Select the newsletter(s) to which you want to subscribe or unsubscribe.

  • Call for tenders
  • Careers
  • News
  • Partners
  • Contact
  • Sitemap

© 2023 West African Power Pool (WAPP)