Skip to main content
  • News
  • Call for tenders
  • Gallery
  • Careers
  • Useful Links
  • Contact
Home
  • WAPP
    • Creation of the WAPP
    • Governing Structures
  • Members Utilities
  • Partners
  • Documentation
  • Calendar
  • Power grid
  • WAPP DEPTS
    • Admin & Finance
    • PIPES
    • ICC
Member space

Member Login

Image CAPTCHA
Lost password
  • English
  • Français

Banner news & pages internes

  1. Home
  2. Construction Project of the 225 KV Guinea-Mali Electric Interconnection Line (PIEGM)
Ref.PIEGM

Construction Project of the 225 KV Guinea-Mali Electric Interconnection Line (PIEGM)

Saturday, June 13, 2020 to Saturday, June 20, 2020
Construction Project of the 225 KV Guinea-Mali Electric Interconnection Line (PIEGM)

As part of the control mission and the supervision of the works for the construction of the 225 kV Guinea-Mali electrical interconnection line and related posts, the Governments of Guinea and Mali have obtained funding from the African Development Bank (AfDB), the European Investment Bank (EIB), the ECOWAS Development and Investment Bank (EBID), the West African Development Bank (BOAD), the World Bank (BM) and European Union (EU) for the realization of the works of the PIEGM which includes:

  1. The construction of a 225 kV double-circuit line approximately 714 km long (from the Sanakoroba substation in Mali to the N’Zérékoré substation in Guinea);
  2. The extension of the 225/33 kV source substation at Sanankoroba located approximately 25 km from Bamako;
  3. Construction of the new 225/30 kV source substations in Siguiri, Fomi, Kankan, Kérouané and Beyla in Guinea; and
  4. The extension of the 225/30 kV source substation at N’Zérékoré in Guinea.

This project is expected to increase the availability of electricity in the two (2) countries and strengthen the establishment of the regional electricity market in West Africa.

The construction allotment of the Guinea-Mali double-circuit 225 kV electrical interconnection line and substations is as follows:

Post tender documents (DAO)

Construction of 225/30 kV substations:

Lot 1: Sanankoroba and Siguiri - funding from the World Bank (WB)

Lot 2: Fomi -financing African Development Bank (AfDB);

Lot 3: Kankan - World Bank financing (WB);

Lot 4: Kérouané - World Bank financing (WB); and

Lot 5: Beyla and Nzérékoré - European Investment Bank (EIB) financing.

Line tender documents (DAO)

Construction of double-circuit 225 kV lines:

Lot 1: Sanankoroba - Guinean-Malian border section (125.6 km) - African Development Bank (AfDB) / West African Development Bank (BOAD) financing;

Lot 2: Guinean-Malian - Siguiri border section (53.7 km) - World Bank (WB) financing;

Lot 3: Siguiri - Fomi section (135.5 km) - ECOWAS Development and Investment Bank (EBID) financing;

Lot 4: Fomi - Kankan section (43.3 km) - African Development Bank (AfDB) financing;

Lot 5: Kankan - Kérouané sections (144.3 km); Kérouané - Beyla (85.2 km) and Beyla - Nzérékoré (126.0 km) - European Investment Bank (EIB) financing.

Click on the links below to download the respective Terms of References;

225_kv_double-circuit_line_at_the_guinean-malian_border_at_the_sanankoroba_substation.pdf

PDF icon225_kv_double-circuit_line_at_the_guinean-malian_border_at_the_sanankoroba_substation.pdf

construction_work_on_the_fomi_22530_kv_substation.pdf

PDF iconconstruction_work_on_the_fomi_22530_kv_substation.pdf

construction_work_on_the_225_kv_double-circuit_line_from_the_fomi_substation_to_the_kankan_substation.pdf

PDF iconconstruction_work_on_the_225_kv_double-circuit_line_from_the_fomi_substation_to_the_kankan_substation.pdf

construction_works_of_the_225_to_30_kv_substations_of_sanankoroba_siguiri_kankan_and_kerouane_in_four_4_lots.pdf

PDF iconconstruction_works_of_the_225_to_30_kv_substations_of_sanankoroba_siguiri_kankan_and_kerouane_in_four_4_lots.pdf

construction_work_on_the_225_kv_double_dull_line_from_siguiri_substation_on_the_border_between_guinea_and_mali.pdf

PDF iconconstruction_work_on_the_225_kv_double_dull_line_from_siguiri_substation_on_the_border_between_guinea_and_mali.pdf

 

 

Construction Project of the 225 KV Guinea-Mali Electric Interconnection Line (PIEGM)
Development
The WAPP Secretariat Evaluates Proposal for the recruitment of a Consultant for the Feasibility Study for the WAPP 225kV Côte d’Ivoire-Liberia Transmission Interconnection Reinforcement Project
Friday, March 24, 2023
Development
Measurement summary for Solar Development in Sub-Saharan Africa
Wednesday, March 15, 2023
WAPP/ECREEE/ERERA Press Release on International Women's Day
Thursday, March 9, 2023
Consult all news
17th Session of WAPP General Assembly

Upcoming events

17th Session of WAPP General Assembly
Monday, November 14, 2022

Center of Documentation

Environmental and Social Impact Study of the 225 kV electrical connection project at the Kaya 75 MWp regional solar power plant First part: ESIA (ESMP in a separate volume)
Environmental and Social Impact Study of the Kaya 75 MWp Regional Solar Power Plant Project First part: ESIA (ESMP in a separate volume)
Environmental and Social Impact Study of the Kaya 75 MWp Regional Solar Power Plant
View all documents


Members
Utilities

Supporting West Africa in the realization of the regional electricity market

Do you need more information ?

Address

West African Power Pool

Zone des Ambassades – PK 6

06 BP 2907 Cotonou

Republic of Benin

Phone / Email

+229 91 21 52 52

+229 91 21 53 53

info@ecowapp.org

Social media

Newsletter

Select the newsletter(s) to which you want to subscribe or unsubscribe.

  • Call for tenders
  • Careers
  • News
  • Partners
  • Contact
  • Sitemap

© 2023 West African Power Pool (WAPP)